Successful primary cementing requires centering of the casing, casing movement, and a properly conditioned hole. Our Scratchers condition the hole by removing mud cake from the face of formation to ensure a good cementing bound and to prevent channeling. They also contribute to the even distribution of the cement slurry and the achievement of a complete fill.
Their hinged design makes them easy to install.
High strength & tempered wire.
Improve Mud removal
Improve Cement placement, creating a more uniform wall thickness
Available Size: 4-1/2” to 20”
Any special sizes or combination can available on request.